PROJECT OVERVIEW
Client: Brooksby PCC
Location: Brooksby, Leicester
Architect: Pick Everard, Leicester
Contractor: CEL Ltd
Value: £120,000
Programme: 8 Month
Materials: Stonework, Slate, Timberwork
The brief included the production and installation of new oak louvres to tower windows, the removal of lead parapet gutters and eave slates to the nave roof, re-ordering of timber substrates and subsequent re-leading, and the use of sandcast lead manufactured by The CEL Group. The top 30ft of the spire was dismantled and rebuilt.






