PROJECT OVERVIEW Client: Ely Diocese Board of Education & Training Location: Cambourne, Cambridgeshire Architect: Design Group, Property & Asset Management Contractor: Kier Eastern Programme: Three-phase new build over three years. Materials: Rheinzink & Softwood boarding The CEL Group’s work on the preweathered zinc roof of this new school is now a template […]
PROJECT OVERVIEW Client: Nottingham Blue Coat School Location: Nottingham Architect: Franklin Ellis Architects Contractor: Marriott Construction Ltd Materials: Milled Lead Sheet Using dormer windows in this new school extension became more than an issue of extra natural light. Using milled lead sheet, The CEL Group were able to make these windows […]
PROJECT OVERVIEW Client: City & County Residential Architect: Cowper Griffith Architect Contractor: City & County Construction Materials: Post Patinated Copper Converting a Buddhist Temple into apartments is not the usual task requested of a contractor but that’s what was required. The previous owners of the development had built this high […]
PROJECT OVERVIEW Client: Sebert Road Training Centre Location: Woodgrange Road, London Architect: Hodder Associates Contractor: Cazenove Architects Materials: Sheet Copper The extension for the Sebert Road Training Centre in Woodgrange Road, London required approximately 850 kg of mill finish sheet copper to clad the roof and walls of the building. Before […]
PROJECT OVERVIEW Client: The NHS Location: Oxmoor, Huntingdon Architect: Macmon Chartered Architect Contractor: Gleeson Building Value: £600,000 Programme: 11 Month Materials: 5,000m² Rheinzink Natural zinc, 1500m² Composite panels, 40,000m Softwood boarding This two phase project for the main health centre, pharmacy, café and retail units began in 2005. The CEL Group installed 5,000m2 […]
PROJECT OVERVIEW Client: Cambridge University Architect: The R H Partnership Contractor: Morgan Sindall Value: £100,000 Materials: Zinc, Lead and Sand clay Plain Tiles Attention to detail has always been a key factor in any R H Partnership design and Newnham College was to be no exception. Blending traditional skills of installing […]
PROJECT OVERVIEW Architect: Archimage Materials: Natural Copper As the original Flag Fen Visitor Centre aged and the number of visitors increased, a new building was required. Architects Archimage wanted something in keeping with the Bronze Age site and developed a roof in a shield design. Flag Fen was […]
PROJECT OVERVIEW Client: Private Client Location: Isle of Man Architect: Auctor Ltd Materials: Prepatinated & Natural Copper The prepatinated copper roof was, to say the least, the easy part of the project! No Less than 9 folds in just over 900mm of copper sheet and then made to 3 different […]
PROJECT OVERVIEW Client: Heathfield Foundation Technology College Location: Cradley Heath, Birmingham Architect: Adams Johns Kennard Ltd Contractor: G.A.J. Construction Limited Value: £180,000 Programme: 2 phases over 2 year Materials: Decking, Insulation, Substrate, Velux Rooflights and Falzinc Falzinc was the material chosen for this project. It has an aluminium core with a zinc coating […]
PROJECT OVERVIEW Client: Redditch Borough Council Architect: Sansome Hall Contractor: William Sapcote Materials: Corus Falzinc Smooth flowing lines formed the essence of the new foyer to the Palace Theatre, Redditch, which sets a task in itself for this new zinc-coated aluminium product. Double curves are never simple and removing rainwater […]